Search history?
 

13 results.

D2.1 Use cases description and requirements analysis available: PRISTINE’s deliverable D2.1 on Use cases description and requirements analysis is already available from the website’s [D21 deliverables section](http://ict-pristine.eu/wp-content/uploads/2013/12/p...


D6.3 Consolidated software for the use cases and final report on the use cases trials and business impact: PRISTINE’s [deliverable D6.3 Consolidated software for the use cases and final report on the use cases trials and business impact](https://opensourceprojects.eu/p/pristine/publicdocuments/10/tree/t...


D6.2 Proof of concept software for the use cases and draft report on the use cases trials and business impact: The first round of experiments carried out as part of the validation work of the PRISTINE SDK has shown promising results. Moreover, it also helped in identifying development issues that have been ...


D3.2 Initial specification and proof of concept implementation of techniques to enhance performance and resource utilization in networks: In this document, “an initial specification and a proof of concept implementation” of the techniques proposed in the previous document, “draft specification”, are presented. The goal is to show how...


D5.4 Consolidated Management System ready!: This document describes the results and major contributions to the Network Management System for RINA networks that the PRISTINE project has been researching and developing. RIB design, NMS System ...


D4.2 Innovative security and reliability enablers: The security objective is set to reduce the security risks as much as possible by defining security functions and enablers. This document, D4.2, builds upon the security functions, mechanisms, and ...


D5.3 Proof of concept DIF Management System: This deliverable describes the proof of concept of DIF Management System for the first iteration of PRISTINE DIF Management System (DMS). Specifically, it contains the design of the DMS manager and...


D2.5 Consolidated SDK: This deliverable describes the consolidated version of the PRISTINE Software Development Kit (SDK). Task T2.3 has collected the feedbacks received from WP3, WP4, WP5 and WP6 during the PRISTINE fir...


D2.6 Advanced RINA Simulator ready!: Simulation is widely accepted validation and verification tool to test and prove new technologies. Simulation runs can reveal design flaws, performance drawbacks and other weak points. Simulation r...


D3.3 on congestion control, resource allocation, routing and forwarding available!: PRISTINE’s [deliverable D3.3 is available from the website’s deliverables section](http://ict-pristine.eu/wp-content/uploads/2013/12/pristine_d33_draft.pdf). Executive summary In this documen...